05 / WORK IN THE OPEN

Where we go.
What it takes.

xOne qualification gates, seven competitor planning references, and a source-linked opportunity backlog. Evidence defines the next step.

RESEARCH SNAPSHOT / 14 November 20267 client references · 6 xOne gates · 12 proposed workstreams

OUR SOURCE PLAN

Evidence opens
the next gate.

These gates come from xOne’s execution plan. Dates below are that document’s estimates, not completion claims or release commitments. Each gate needs its own acceptance evidence.

How to read the estimates

The source plan starts on 16 November 2026 and applies a 1.5× calendar allowance. Dependencies, oracle access, soak time, and owner decisions can move the dates. No gate is marked qualified by this website.

Read the full source plan
AFoundationQualification required

Feasibility & rule scope

Qualify the pinned fork-table comparison, wide-balance/revert behavior, and the scope of XDC-specific rules.

Source estimate
19 Nov 2026
Depends on
Oracle access and owner decisions
BFoundationQualification required

Correctness & durability

Retain zero-mismatch fork-boundary replay, crash/restart/unwind evidence, and one regression per resolved finding.

Source estimate
27 Nov 2026
Depends on
Gate A prerequisites
CQualificationQualification required

Sync & follower qualification

Qualify authenticated bootstrap, bounded resources, supported RPC parity, and live follower restarts on the declared networks.

Source estimate
6 Dec 2026
Depends on
Correctness, storage, and retention evidence
DQualificationQualification required

Isolated producer safety

Prove anti-equivocation under rollback, restore, and failover; complete the declared 72-hour fault-injected devnet soak.

Source estimate
6 Dec 2026
Depends on
Durable state and signer integration
ERolloutQualification required

Packaged release & rollout

Verify the exact artifact, authorize each public producer test separately, and complete the mainnet follower replay and 14-day soak.

Source estimate
7 Jan 2027
Depends on
B/C/D evidence, artifacts, public-test authorization
QResearchQualification required

Post-quantum readiness research

Maintain crypto inventory, threat model, pinned standards, interface options, and measured costs. Research does not establish quantum resistance.

Source estimate
24 Nov 2026
Depends on
Separate research track
Research stays separate. Track Q and the competitor-inspired backlog do not establish quantum resistance, protocol approval, or permission to activate a network change.

SOURCES, NOT SHORTCUTS

Primary publisher pages and repositories were reviewed on 14 November 2026. The summaries are a planning snapshot; later releases may change them. Ethereum roadmaps inform research and do not automatically transfer Ethereum consensus rules, EIPs, gas limits, or timelines to XDC.

KEEP THE CURIOSITY GOING

Another way in.

YOUR NEXT STEP

Build your way.

Choose an implementation to see its source-based build recipe.

Use the pinned Rust toolchain and platform build prerequisites in the repository.

git clone https://github.com/XDCIndia/xOneRS.git
cd xOneRS
cargo build --locked --release -p xone
./target/release/xone --version

This recipe builds the client; it does not start a node. Mainnet operation is not yet qualified.

Open source guide